4D Construction Simulation
A simulation of the construction sequence will be created based on the optimized schedule for analysis and presentation purposes. The format will be delivered as an AVI movie.
Standard 4D Construction Simulation
• The 3D construction model
+
• A constructability analysis with coordination management
+
• A 4D schedule simulation
How 4D and 5D is Integrated?